University Of Toronto Athletic Centre
 

The University of Toronto Athletic Centre has received both our Pipe Shield System to rehabilitate pool piping and our CIPP Cured-In-Place-Pipe system to rehabilitate several sections of large diameter PVC piping sections for the Olympic sized pool and the teaching pool. In both cases 100’s of thousands of dollars in expenses were saved by avoiding having to cut through the pool decking, stairwells, structural foundations and the pool structure to access the damaged and cracked piping. Pool shut down was kept to a minimum.